The Gujarat Hybrid Renewable Energy Park or Khavda Solar Park is a renewable energy park under construction near Vighakot village in Kutch district of Gujarat, India, near Pakistan. Slated to be the world's largest hybrid renewable energy park,[1] it is being built on 72,600 hectares (179,000 acres) of waste land.[1][2] It is expected to generate 30 gigawatts (GW) from solar panels and wind turbines, enough to power 18 million Indian homes.[3] 1 GW capacity was commissioned in March 2024.
The Power Grid Corporation of India will manage the electric power transmission.[4] The park is expected to generate 100,000 jobs and attract an investment of ₹150,000 crore (US$18 billion). It also accounts for 5 crore tonnes carbon emission reductions each year.[1] The government also has plans to install 14 GWh grid-scale battery storage system.[5]
The Ministry of Power plans to spend ₹18,598 crore (US$2.2 billion) to build infrastructure to move 7 gigawatt from the park.[6]
Remove ads
History
The proposal of the park was approved by the Government of Gujarat on 9 September 2020, allocating 60,000 hectares (600 km2) of land. The proposal had mentioned total 41.5 gigawatt capacity.[8] The foundation stone of the project was laid on 15 December 2020 by Indian Prime Minister Narendra Modi.[1][2] The 30-km road leading to park was constructed.[9][10] In March 2024, AGEL commissioned 1 GW capacity which needed the installation of 2.4 million photovoltaic modules. AGEL had secured funding for the construction 2.1 GW capacity.[11] GIPCL's 600 MW capacity is under construction.[12] The first 250 MW wind power came online in July 2024.[13]
The park was expected to achieve the half of its capacity by December 2024, and be complete by December 2026.[10]