Solar power in Gujarat

Overview of solar power in Gujarat From Wikipedia, the free encyclopedia

Solar power in Gujaratmap
Remove ads

Solar power in Gujarat, a state of India, is a fast developing industry given that the large state is mostly arid. It was one of the first states to develop solar generation capacity in India.

Quick Facts Country, Location ...

As June 2024, total installed solar power generation capacity of the state was 14,182 MW.[1]

Remove ads

State solar policy

As of 30 June 2022, Gujarat has an installed capacity of 19,414 MW of renewable energy, and includes 9419.42 MW of wind power, 7806.80 MW of solar power, 1990 MW of large hydro power, 109.26 MW of bio power and 89.39 MW from small hydro power.[2]

Under the Scheme for Development of solar parks and Ultra-mega Solar Power Projects is underway with a target of setting up to 40,000 MW of Solar capacity.[2]

In addition to the existing solar power policy, the state has also come out with a solar-wind hybrid policy, looking to establish four-five such parks with at least 2000 MW capacity.[3][4]

Total installed solar power generation capacity of the state increased from 4,431 MW in March 2021[5] to 7,180 MW in March 2022.[6]

Remove ads

Rooftop solar

Total rooftop solar power installation capacity of state is 3455.90 MW, as of April 2024.[7] Gujarat is a top performing state in India in respect to rooftop solar.[8]

Location of Solar parks

More information Location, District ...
Remove ads

Solar Power Generation Report Statewide

Summarize
Perspective
More information Month, Power (MWp) ...

Source: SLDC Gujarat[41]

2011 Generation detail

More information January, February ...

2012 Generation detail

More information January, February ...

2013 Generation detail

More information January, February ...

2014 Generation detail

More information January, February ...

2015 Generation detail

More information January, February ...

2016 Generation detail

More information January, February ...
Remove ads

Project list

Summarize
Perspective
More information Developer, Location ...

Source: GEDA[90]

Remove ads

Gujarat Solar Park-1

Gujarat solar park 1, also called Charanka Solar Park, is being built on a 2,000-hectare (4,900-acre) plot of land near Charanka village in Patan district, northern Gujarat. So far, the park has witnessed investments of Rs 5,365 crore and generated 3,441 million units till date.

Installed generation capacity is at about 615 MW at present, having been commissioned by 31 developers in the Solar Park. GACL (Gujarat Alkalies and Chemicals Limited) is setting up 30 MW Solar PV plant, and GNFC (Gujarat Narmada Valley Fertilizers and Chemicals) is in the process of setting up 10 MW project.

The Gujarat Power Corporation Limited (GPCL), the project's developer, said in April 2018 that further capacity addition of 150 MW taking the total to 790 MW may be opted for soon given the availability of land in the Park.[91]

Projects of 95MW are under construction and 30MW under planning as of December 2018.[92]

Remove ads