Guthrie Corridor Expressway

Expressway in Malaysia From Wikipedia, the free encyclopedia

Guthrie Corridor Expressway
Remove ads

Guthrie Corridor Expressway, GCE, Guthrie Corridor Expressway (Malay: Lebuhraya Koridor Guthrie) is an expressway in Klang Valley, Selangor, Malaysia. It connects Shah Alam to Rawang. GCE is approximately 25 km (16 mi) (23 km (14 mi) long on the Prolintas sections and 2 km (1.2 mi) on the PLUS Expressway sections).

Quick Facts Expressway 35, Route information ...
Remove ads

Named after the corridor of estates where 80 percent of the land acquired was from the plantation company Guthrie Berhad (later merged in 2007 with two other two other companies to form Sime Darby), all project costs, including land acquisition of the expressway, were completely borne by the concessionaire. Today this expressway is owned by Prolintas and its subsidiary Prolintas Expressway Sdn Bhd.

The starting point of the highway or 'Kilometre Zero' is located at the Jalan Monfort intersection near Shah Alam.

Remove ads

History

Summarize
Perspective

Plans to build the 30 km-long expressway, named after Kumpulan Guthrie's corridor of estates in Selangor, began in late 1996. The expressway would be a way to speed up and link various developments around the corridor, including the Lagong satellite city and the Bukit Jelutong township. The construction of the expressway would cost between RM 300 million and RM 450 million and would be completed in three to four years. Kumpulan Guthrie had submitted an application to the federal government and was still negotiating with the Selangor state government.[1]

The proposal was revived in 2002 when Guthrie Berhad became a major shareholder of this project, apart from owning other businesses such as large plantations and property development projects. Construction started in 2003 and was completed in April 2005. It commenced operations in July that year.

In August 2007, GCE became a subsidiary of Prolintas Expressway Sdn Bhd, which is ultimately owned by PNB.

On 17 August 2023, a private plane carrying Pahang State Legislative Assembly member Johari Harun and seven other passengers crashed onto the highway, just outside the Elmina interchange. There were ten fatalities, including the passengers and two motorists.[2]

Remove ads

Features

Thumb
GCE view from ELITE ramp.
  • Smooth access from Shah Alam to northern states without being trapped in common traffic jams in the New Klang Valley Expressway (NKVE).
  • Many oil palm estates with property development potential along this expressway.
  • Motorcycle lane, including a southbound flyover which passes above the Denai Alam exit, built as part of the DASH Highway construction project.
  • SOS emergency.
  • Competitive toll rate.
  • Speed limits are 90 km/h–110 km/h
  • Several rest areas (R&R) near toll plazas with free Wi-Fi
  • Malaysian Road Transport Department (JPJ) Enforcement Stations
Remove ads

Tolls

GCE adopts an open toll system.

Electronic Toll Collections (ETC)

As part of an initiative to facilitate faster transactions at the Bukit Jelutong, Elmina and Lagong Toll Plazas, all toll transactions at these three toll plazas on GCE are conducted electronically via Touch 'n Go cards or SmartTAGs beginning 2 March 2016.

Toll rates

There are three toll plazas along GCE, each charging the same rate. In October 2022, it was one of the four expressways maintained by PROLINTAS to have its toll rates deducted between 8% and 15%.[3][4]

(Starting 20 October 2022)[5][6]

More information Class, Type of vehicles ...

List of interchanges and rest and service areas

Summarize
Perspective

Below is a list of interchanges (exits), laybys and rest and service areas along GCE. The exits are arranged in ascending numerical order from North to South.

More information km, Exit ...
Remove ads

References