Kefeng Lu station

Guangzhou Metro station From Wikipedia, the free encyclopedia

Kefeng Lu stationmap
Remove ads

Kefeng Lu Station (simplified Chinese: 科丰路站; traditional Chinese: 科豐路站; pinyin: Kēfēnglù Zhàn; Jyutping: fo1fung1lou6 zaam6) is a station of Guangzhou Metro Line 7, located underground at the intersection of Kefeng Road and Kaitai Avenue in Guangzhou's Huangpu District.[1] It opened on 28 December 2023, with the opening of Phase 2 of Line 7.[2]

Quick facts Chinese name, Simplified Chinese ...
Remove ads

Station layout

G Street level Exits B, C, D
L1
Concourse
Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities
L2
Platforms
Platform 2 arrow for L  7  towards Meidi Dadao (Jiazhuang)
Island platform, doors will open on the left
Platform 1  7  towards Yanshan (Luogang) arrow for R

Exits

The station was designed with four exits.[3] In the station's initial opening, only Exits C and D on the west side of the Kefeng Road intersection of Kaitai Avenue were opened, while Exit B on the other side of the road was opened on 26 January 2025.[4] In addition, the construction of Exit A has not yet been implemented.

The distance between this station and Suyuan Station is about 800 meters. Guangzhou Metro believes that the distance between the two stations is too long, and there are interchanges to Line 6 and Line 21 respectively at Luogang and Shuixi stations, so it does not set up a long transfer passageway to connect the two stations, but reserves an interface to connect to Luogang Wanda Plaza at Exit C, which is connected to Suyuan Station.[5]

More information Exit letter, Gallery ...

[1]

Remove ads

History

In Phase III of the Guangzhou Metro construction plan approved in 2017, Line 7 will set up Xinyang Xilu Station near the intersection of Xinyang Road West and Kaitai Avenue (i.e., the east side of the station's current location).[6] In 2018, during the EIA phase of this line, Xinyang Xilu Station was adjusted to the location of this station and renamed to Kefeng Lu, which was finally implemented.[7] On 4 September 4, 2019, the station site began enclosure construction.[8]

At 12:00 on December 28, the station was put into use with the opening of Line 7 Phase 2.[2]