Top Qs
Timeline
Chat
Perspective
Line 5 (Hangzhou Metro)
Subway line of the Hangzhou Metro in China From Wikipedia, the free encyclopedia
Remove ads
Line 5 of the Hangzhou Metro (simplified Chinese: 杭州地铁五号线; traditional Chinese: 杭州地鐵五號線; pinyin: Hángzhōu Dìtiě Wǔhào Xiàn) is a subway line in Hangzhou. The line is colored cyan on system maps. All 40 of its stations are underground.
Remove ads
Opening timeline
Remove ads
Stations
Summarize
Perspective
Line 5 runs from East Nanhu to Guniangqiao. The western terminus, Guniangqiao, is an interchange with Shaoxing Metro Line 1.

- Legend
- Operational
- Under construction
Remove ads
Description
Phase 1 of the line is 48.6 km (30.2 mi) long with 36 stations and runs between Central Park station in Yuhang District and Xiangzhang Road station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system including Hangshao line (now Keqiao section of Line 1 of the neighboring Shaoxing Metro).[8] Phase 2 of the line further extends 3.2 km and two stations east to Lvting Road.[9] A 5 km (3.1 mi), two station extension west to Laoyuhang station in Yuhang District started construction in 2018.[10]
Rolling stock
The Line 5 uses higher capacity six car Class AH trains which are 20 cm wider than the Class B trains used in other Hangzhou Metro lines, increasing capacity by about 10%.[11]
Remove ads
See also
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads