Top Qs
Timeline
Chat
Perspective

Shaoxing Metro

Urban rail transit system in Shaoxing, China From Wikipedia, the free encyclopedia

Shaoxing Metro
Remove ads

Shaoxing Metro (Chinese: 绍兴轨道交通; pinyin: Shàoxīng Guǐdào Jiāotōng), also known as Shaoxing Rail Transit, is the metro system in Shaoxing, Zhejiang province, China. It operates 2 subway lines. Line 1 (including branch line) and Line 2.

Quick Facts Overview, Locale ...
Remove ads

Network

Summarize
Perspective
Thumb
System map for operational lines
More information Line, Terminals ...

Line 1

Line 1 began construction in 2016. The section from Guniangqiao to China Textile City opened on 28 June 2021,[1] the remaining section from China Textile City to Fangquan opened on 29 April 2022. A branch line from Huangjiu Town to Daqingsi will opened in 2024. The extension of the branch line to Convention and Exhibition Center will open in 2025.[4] The Line connects the Yuecheng and Keqiao districts to Hangzhou through the western terminus, Guniangqiao, as it is also the eastern terminus of Hangzhou Metro Line 5.

Thumb
A line 2 train at Tandu Station, the current terminus of Line 2.

Line 2

Line 2 is 10.73 km in length with 9 stations.[3][5] All stations are located underground.[2] Line 2 opened on 26 July 2023.[2] The Phase two extension will connect the Yuecheng and Shangyu districts of Shaoxing.[6]

Line 4

Line 4, a southern extension of the Line 1 branch, is presently under construction. It includes 20.7 km of new track and 15 new underground stations. It is entirely located in Yuecheng district and will have two interchange stations with Line 1, with one at Huangjiu Town and City square. [7]

Remove ads

Lines under Construction

Summarize
Perspective
More information Route, Name ...

Planned

The Phase II Construction Plan of the Shaoxing Metro, which encompasses Lines 3, and 5, are currently in the planning stages.

Lines S2 (Shaoxing–Zhuji) and S3 (Shaoxing–Shengzhou–Xinchang) are also under planning.[9]

Rolling Stock

Thumb
The inside of a Line 1 train

Line 1 utilizes rolling stock produced by CRRC Nanjing Puzhen, with a length of 120 m, height of 3.8 m and width of 2.88 m. It has 2 power cars with 6 cars in total. Each train set has 232 seats with a maximum capacity of 2034 people. It has a top speed of 100 km/h. It features LCD screens that display the station information. [10]

Thumb
The LCD screen in a Line 1 train

Line 2 ultilizes 4 car trainsets from CRRC Nanjing Puzhen, with a length of 80.84 m and a width of 2.88 m. Line 2 is self driving with windows on both ends of the train. It also features LCD screens that display station information.[11]

Remove ads

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads