Top Qs
Timeline
Chat
Perspective
M3 motorway (Hungary)
Road in Hungary From Wikipedia, the free encyclopedia
Remove ads
The M3 motorway (Hungarian: M3-as autópálya) is a Hungarian motorway connecting Budapest to Nyíregyháza. It will eventually connect Budapest to the Ukrainian border. Two other motorways branch off it, the M30 (connecting the M3 to Miskolc) and the M35 (connecting the M3 to Debrecen). The M3 follows route 3, and, later, route 4. The section of the motorway between Görbeháza and Nyíregyháza was opened to traffic in August 2007. The section of the motorway between Highway 49 and Vásárosnamény was opened to the public in 2014.[1] The total length of the motorway now is 281 km.
![]() | This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|





Remove ads
Openings timeline
- Budapest – Gödöllő (14 km): 1978.10.16.
- Gödöllő – Hatvan (29 km): 1980.10.31.
- Hatvan – Gyöngyös-west (15 km): 1983
- Gyöngyös-west – Füzesabony (44 km): 1998.09.01.
- Füzesabony – Polgár (61 km): 2002
- Polgár – Görbeháza; M35 (11 km): 2004.10.
- Görbeháza; M35 – Nyíregyháza (41 km): 2007.08.31.
- Nyíregyháza bypass (8 km): 2006.08.05.
- Nagykálló – Őr (33,8 km): 2013.01.16.
- Őr – Vásárosnamény (11,9 km): 2014.10.10.
Remove ads
List of junctions, exits and rest area
Summarize
Perspective
![]() | This article contains a bulleted list or table of intersections which should be presented in a properly formatted junction table. (November 2021) |
Distance from Zero Kilometre Stone (Adam Clark Square) in Budapest in kilometres.
The route is full length motorway. The maximum speed limit is 130 km/h, with
(2x2 lane road with stop lane).
- Under construction, Planned section
Remove ads
Maintenance
The operation and maintenance of the road by Hungarian Public Road Nonprofit Pte Ltd Co. This activity is provided by these highway engineers.
- near Gödöllő, kilometre trench 23
- near Kál, kilometre trench 103
- near Emőd, kilometre trench 151
- near Hajdúnánás, kilometre trench 204
- near Újfehértó, kilometre trench 254
Payment
Hungarian system has 2 main type in terms of salary:
1, time-based fee vignettes (E-matrica); with a validity of either 10 days (3500 HUF), 1 month (4780 HUF) or 1 year (42980 HUF).[2]
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:
Remove ads
Significant artifacts
From Budapest to the Ukrainian border, the M3 motorway features the following bridges, tunnels or covered cuts:
- Bridge
- Tisza Bridge of Polgár (Polgári Tisza-híd; 405.5 m or 1,330 ft) over Tisza river
- Landscape history memorial park
- M3 Arcehopark – Open-air museum near this motorway
- Outlet center
- M3 Outlet Center
European Route(s)
Name | Route | |
![]() |
124 km | ![]() ![]() ![]() ![]() |
![]() |
89 km | Rétaljai pihenőhely ![]() ![]() |
![]() |
36 km | ![]() ![]() ![]() ![]() |
![]() |
7 km | ![]() ![]() ![]() ![]() |
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads