Top Qs
Timeline
Chat
Perspective

Macau Refuse Incineration Plant

Incinerator in Taipa, Macau, China From Wikipedia, the free encyclopedia

Macau Refuse Incineration Plantmap
Remove ads

The Macau Refuse Incineration Plant (MRIP; Chinese: 澳門垃圾焚化中心; Portuguese: Incineração de Resíduos Sólidos de Macau) is an incinerator in Taipa, Macau.

Quick facts Macau Refuse Incineration Plant澳門垃圾焚化中心 Incineração de Resíduos Sólidos de Macau, Operated ...
Quick facts Traditional Chinese, Simplified Chinese ...
Remove ads

History

The plant was commissioned in 1992. In 2009, the waste processing capacity of the plant was doubled.[1][2]

Architecture

The plant spans over an area of 4.5 hectares.[3]

Technical details

The plant has a waste processing facility of 1,728 tons per day being done by its six incinerators, with the current capacity of 1,400 tons/day.[3][4]

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads