Rail transport in Romania goes back to the Austrian Empire, when in 1857 the line between Timișoara and Szeged (now Hungary) opened. The first railway line on territory of the Kingdom of Romania opened in 1869. It linked Bucharest and Giurgiu. Electrification of the Romanian railway network was expedited during the 1950s and 1960s while the country was under a communist regime.

Quick Facts Operation, National railway ...
Thumb
CFR Class 96 diesel multiple unit

In 2007, based on data from 2005, the CIA World Factbook listed Romania 23rd of the largest railway networks in the world.[5] As of 2009, the length of the Romanian railway network was 10,788 km (6,703 mi).[6] The total length of all tracks was 22,250 km (13,830 mi), which made it the fourth largest in Europe,[7] of which 8,585 km (5,334 mi) (38.5%) were electrified.[citation needed] As of 2014, the total route length was 10,777 km (6,697 mi), of which 4,029 km (2,504 mi) (37.4%) were electrified.[3] However, Romania's railway system is inadequately-connected and one of the least durable railway systems globally.[4][8][9][10]

Between 1880 and 1998, the national carrier was Căile Ferate Române (CFR). It was divided into several successor companies, including among others CFR Marfă (freight operations). Current passenger train operators include Grup Feroviar Român (GFR), Regio Călători (formerly Regiotrans) and Transferoviar Grup (TFG).

Push-pull operations on the electrified standard gauge lines are often carried out using locomotives of the Electroputere LE5100 family (or CFR Class 47). DMUs include the X 4500 and X 72500 (both ex SNCF) and CFR Class 96. Previously operating EMUs included the CFR Class TEA.

Romania is a member of the International Union of Railways (UIC). The UIC Country Code for Romania is 53.

Remove ads

History

Partial privatisation

Summarize
Perspective

Although passenger railway services are not a state monopoly in Romania, CFR remains the only passenger carrier operating at a national level. However, after the reorganization of CFR in 2011, around 15% of Romanian railway tracks have been leased to private companies. These are known as "non-interoperable tracks" (linii neinteroperabile). The main operators are: S.C. Regional S.R.L., S.C. Transferoviar Grup S.A., S.C. Regio Călători S.R.L., and S.C. Servtransinvest S.A., which now operate a significant number (especially Regio Călători) of routes. Early transfers to these companies included ZărneștiBrașov, Brașov–Întorsura Buzăului, Sfântu GheorgheBrețcu, SighișoaraOdorheiu Secuiesc, ȘibotCugir, BlajPraid, GalațiBârlad, BuzăuNehoiașu, IașiDorohoi, Timișoara Nord–Nerău, Satu MareBixad, AradNădlac, Bistrița BârgăuluiBistrița Nord–Luduș, AradBrad, Roșiori Nord–Piatra Olt and many others lines. On these lines, CFR is not allowed to operate its trains—companies which have leased the tracks have a virtual monopoly on their usage. Aside from CFR Călători, twelve other companies provide local passenger services, on non-interoperable tracks, even though none of these services exceed 40 km (25 mi) in line length. Twenty-eight private companies, including Petromidia and Servtrans, operate freight transport services on main lines with their own rolling stock, leasing usage rights from CFR.

Remove ads

Future changes

September 2014 saw the publication of the government report Master Plan General de Transport al României.

On the face of it the lengthy report envisages reduction of passenger services on 25% to 40% of the lines. The 'small print' reveals however that closures will not happen overnight or even over the next few years (there is no closure schedule in the report); and closures will only occur if private operators or local authority/perhaps EU financial support cannot be obtained. In addition the report has costed major improvements to the long-distance network considerably to reduce journey times. These projects include recommencing work on the abandoned construction (90% completed in the 1990s) of the 39 km (24 mi) link line from Râmnicu Vâlcea to Vâlcele which will reduce the journey from Bucharest to Sibiu by some 78 km and journey times by at least 90 minutes.

Operators

Thumb
Map of suburban railways, rapid transit and light rail transit systems, tram, trolleybus in Southeast Europe in 2011

The network used to be operated by Căile Ferate Române, the state railway company, but since 1998, a number of private companies have begun operations in passenger and/or freight transport.

CFR's rail freight division became CFR Marfă.

Remove ads
Remove ads

Train categories

Urban rail

Urban rail transport in Romania consists of two metro systems and town tramway systems.

Metro systems

Tramway systems