Top Qs
Timeline
Chat
Perspective
Ranggajati
From Wikipedia, the free encyclopedia
Remove ads
Ranggajati is a train that serves the Cirebon–Jember route via the southern railway line of Java Island (via Purwokerto–Yogyakarta–Surabaya Gubeng).
The name of this train comes from a figure from Cirebon named Ki Gede Ranggajati who was instrumental in spreading Islamic teachings in the Cirebon area (city and regency) at that time and was the founder of the Sumber Kingdom which later became the capital of the regency.
Remove ads
History
The inauguration of this train was carried out on 1 November2016, attended by a number of officials from Greater Cirebon and the leadership of KAI Operations Area III Cirebon. Initially, the travel time for this train was 15 hours 53 minutes. At the same time, the Logawa train departing from Jember was delayed for 70 minutes.[1]
Based on the latest schedule, the travel time of the Ranggajati train has been accelerated to 13 hours 43 minutes and since 1 November 2024, this train has changed its train series from the one that originally carried executive-business class to the executive-economy class series.[2]
Remove ads
Route
Remove ads
Incident
On 17 December 2019, the air conditioning of this train was not working due to interference originating from the generator train shortly before entering Madiun.[3]
Reference
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads