Top Qs
Timeline
Chat
Perspective

Donghae Line

Railway line in eastern South Korea From Wikipedia, the free encyclopedia

Donghae Line
Remove ads

The Donghae Line (Korean: 동해선) is a railway line connecting Busanjin station to Samcheok station in South Korea. The literal meaning of its name, the "East Sea Line," reflects its position along the nation's East coast. It merged with the Donghae Nambu Line on December 30, 2016, and will merge with the Donghae Bukbu Line.

Quick Facts Overview, Native name ...

In January 26, 2018, the East Sea Line was partially extended to Yeongdeok Station, and on January 1, 2025, the line between Yeongdeok Station and Samcheok Station was opened.

Remove ads

Stations

Major stations along the line include (in order):

Remove ads

Services

Summarize
Perspective

KTX

Plans foresee direct KTX high-speed train service from Seoul to Pohang and Ulsan after the completion of the upgrades. From 2015, direct KTX trains are to reach Pohang from Seoul in 1 hour 50 minutes, cutting 33 minutes from the travel time with transfer at Gyeongju.[1] Under the government's 2010 strategic plan for 2020, the entire line may see KTX service.[2]

Busan–Ulsan commuter trains

In the Busan–Ulsan section, higher frequency commuter rail service between Bujeon and Ilgwang began on December 30, 2016. Service operates approximately every 15 minutes during the peak periods and 30 minutes during the off-peak. The line is integrated into the Busan Metro network and accepts the Hanaro Card and Digital Busan Card, as well as the T-Money card from Seoul.

More information Station #, Station name ...

Rolling stock

Remove ads

Upgrade

Summarize
Perspective

Pohang–Samcheok extension

At the time of thawing relations between South and North Korea, when the cross-border section of the Donghae Bukbu Line was reopened in 2007, the South Korean government considered the construction of a railway for freight traffic all along the east coast to the North Korean border.[3][4] As part of the corridor, a new single-track, non-electrified line for 150 km/h (93 mph) would connect Pohang and Samcheok, the end of a branch of the Yeongdong Line.[5] new line is to connect to the existing railhead at Samcheok. Work started on the Pohang-Yeongdeok section on March 20, 2008, with a foreseen budget of 2,949.5 billion won for the entire line until Samcheok.[6] As of 2009, progress reached 5.9% of a planned budget reduced to 2,831.749 billion won, and completion of the 171.3 km (106.4 mi) long project was planned for 2016.[7] Under the government's 2010 strategic plan for 2020, the Pohang–Samcheok extension is to be further upgraded for 230 km/h (140 mph).[2]

On January 1, 2025, when the Yeongdeok Station to Samcheok Station opened, 12 stations were newly established as intermediate stations, including Yeonghae, Goraebul, Hupo, Pyeonghae, Giseong, Maehwa, Uljin, Jukbyeon, Heungbu, Okwon, Imwon, and Geundeok.

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads