Top Qs
Timeline
Chat
Perspective

Silverlink

Former train operating company in England From Wikipedia, the free encyclopedia

Silverlink
Remove ads

Silverlink[1] was a train operating company in the United Kingdom owned by National Express that operated the North London Railways franchise from March 1997 until November 2007. At the end of 2007, Silverlink Metro services were taken over by London Overground and Silverlink County services were taken over by London Midland.

Quick Facts Overview, Franchise(s) ...
Remove ads
Remove ads

History

The North London Railways franchise was awarded to National Express on 7 February 1997.[2] National Express commenced operating the franchise on 3 March 1997.

After initially trading as North London Railways, in September 1997 the franchise was rebranded as Silverlink.[3]

The franchise was due to finish on 15 October 2006, but on 11 August 2006 the Department for Transport granted an extension until 10 November 2007.[4] Upon its closure, its London metro services were taken over by London Overground and the remainder were merged with Central Trains' western services to form London Midland.

Remove ads

Branding

Summarize
Perspective

Silverlink had two sub-brands:

Silverlink Metro was used for services primarily within Greater London:

Silverlink County was used for services beyond Greater London:

Silverlink Metro operated these services.

Note: Changes during the franchise period are noted but changes to the lines before and after the franchise are not.

North London line

These services ran on the North London line:

 Richmond (interchange for District line)
 Kew Gardens (interchange for District line)
 Gunnersbury (interchange for District line)
 South Acton
 Acton Central
 Willesden Junction (interchange for Bakerloo line, West London line and Watford DC Line)
 Kensal Rise
 Brondesbury Park
 Brondesbury
 West Hampstead (interchange for Jubilee line and First Capital Connect)
 Finchley Road & Frognal
 Hampstead Heath
 Gospel Oak (interchange for Gospel Oak to Barking line)
 Kentish Town West
 Camden Road
 Caledonian Road & Barnsbury
 Highbury & Islington (interchange for Victoria line)
 Canonbury
 Dalston Kingsland
 Hackney Central
 Homerton
 Hackney Wick
 Stratford (interchange for Central line, Jubilee line, Docklands Light Railway, c2c (limited services - early morning, late night and during engineering works only) and National Express East Anglia)
 West Ham
 Canning Town
 Custom House
 Silvertown
 North Woolwich

† At the end of service on Saturday 9 December 2006 the line between Stratford and North Woolwich closed, as much of the route was duplicated by the Docklands Light Railway and the Jubilee line, leaving Stratford as the eastern terminus of the North London Line.[5]

West London line

These services ran via the West London line:

 Willesden Junction (interchange for North London Line, Watford DC Line and Bakerloo line)
 Kensington (Olympia) (interchange for District line and Southern)
 West Brompton (interchange for District line and Southern)
 Clapham Junction (interchange for South West Trains and Southern)

Shepherd's Bush on the West London Line was due to open under the franchise (with signage in Silverlink colours installed), but platform widening work meant that it finally opened in September 2008 under London Overground management, the signage being replaced with the London Overground roundels by that time.

Watford DC line

These services ran on the Watford DC line:

 London Euston (interchange for Northern line, Victoria line and Virgin (West Coast Main Line)
 South Hampstead
 Kilburn High Road
 Queen's Park
 Kensal Green
 Willesden Junction † (interchange for North London Line and West London Line)
 Harlesden
 Stonebridge Park
 Wembley Central † (interchange for Southern during the peaks)
 North Wembley
 South Kenton
 Kenton
 Harrow & Wealdstone † (interchange for Northampton Line and Southern)
 Headstone Lane
 Hatch End
 Carpenders Park
 Bushey
 Watford High Street
 Watford Junction (interchange for Northampton Line, St Albans Abbey Line, Virgin (West Coast Main Line), Southern)

† = also served by the Bakerloo line.

Gospel Oak to Barking line

These services ran on the Gospel Oak to Barking line:

 Gospel Oak (interchange for North London Line)
 Upper Holloway
 Crouch Hill
 Harringay Green Lanes
 South Tottenham
 Blackhorse Road (interchange for Victoria line)
 Walthamstow Queens Road
 Leyton Midland Road
 Leytonstone High Road
 Wanstead Park
 Woodgrange Park
 Barking (interchange for District line, Hammersmith & City line and c2c)

Birmingham/Northampton

Birmingham Line services ran on the slow lines of the West Coast Main Line. The service was cut back to Northampton in September 2004, with services north of Northampton being transferred to partner operator Central Trains,[6] and some through services remained. (Central Trains, like Silverlink, was a subsidiary of National Express and the operations shared rolling stock.)

 London Euston (interchange for Watford DC Line and Virgin Trains West Coast and First ScotRail sleeper service)
 Harrow & Wealdstone (interchange for Watford DC Line and Southern (via West London Line) )
 Bushey
 Watford Junction (interchange for Watford DC Line, St Albans Abbey Line, Virgin Trains and Southern)
 Kings Langley
 Apsley
 Hemel Hempstead
 Berkhamsted
 Tring
 Cheddington
 Leighton Buzzard
 Bletchley (interchange for Marston Vale Line)
 Milton Keynes Central (interchange/terminus for Southern, interchange with Virgin Trains)
 Wolverton
 Northampton

Prior to 2004 the service also continued to Birmingham, calling at the following stations:

 Long Buckby
 Rugby
 Coventry
 Birmingham International
 Birmingham New Street

Abbey Line

These services ran on the Abbey Line

 Watford Junction (interchange for Northampton/Birmingham services, Virgin West Coast, Watford DC Line and Southern)
 Watford North
 Garston
 Bricket Wood
 How Wood
 Park Street
 St Albans Abbey

Marston Vale line

These services ran on the Marston Vale line between Bedford and Bletchley:

 Bletchley (interchange for Northampton Line)
 Fenny Stratford
 Bow Brickhill
 Woburn Sands
 Aspley Guise
 Ridgmont
 Lidlington
 Millbrook
 Stewartby
 Kempston Hardwick
 Bedford St Johns
 Bedford (interchange for First Capital Connect and Midland Mainline)
Remove ads

Performance

Silverlink was categorised as a London and South East operator by the Office for Rail Regulation (ORR) and was one of the best performing TOCs in this sector with a PPM (Public Performance Measure) of 90.8% for the last quarter of the financial year 2006/7.[7] Despite these figures,[8] the Silverlink Metro franchise on the North London Line was regarded by frequent travellers as offering a poor service,[9] with extremely congested trains and an unreliable service[10] with some trains cancelled shortly before they were due to arrive. A London Assembly report said passengers found the service "shabby, unreliable, unsafe and overcrowded".[11]

Rolling stock

Summarize
Perspective

Silverlink inherited a fleet of Class 117 and Class 121 diesel multiple units, and Class 313 and Class 321 electric multiple units, from British Rail.

To replace the elderly Class 117s and 121s, which operated the Gospel Oak - Barking and Bletchley - Bedford services, seven Class 150 Sprinters were transferred from Central Trains in summer 1999; an eighth followed in 2006.[12][full citation needed] Pending the Sprinters' arrival, Silverlink hired Class 31 locomotives from Fragonset to top and tail Mark 2 carriages on Bletchley - Bedford services in 1998/99.

The Class 313s operated Metro services on the electrified routes; they were joined on the Euston - Watford Junction service in 2003 by three Class 508s transferred from Merseyrail. The Class 321s operated County services to Northampton and Birmingham; they were joined in 2005 by new Class 350s. The Watford Junction - St Albans Abbey service was operated for many years by Class 313s, but later was usually operated by Class 321s with Silverlink Metro drivers and Silverlink County guards.

On 16 July 2004, Virgin Trains announced that it was withdrawing most of its stops at Milton Keynes Central, which were used by up to 6,000 passengers a day. Commuters became unhappy at the prospect of switching to older Silverlink trains, and a longer journey. Silverlink countered this with the temporary usage of ex-Virgin stock, still in Virgin colours.[13]

The Strategic Rail Authority decided to divert thirty four-carriage Siemens Desiro trains from an order placed by South West Trains to provide stock with faster acceleration for the West Coast Main Line operators. These trains, the Class 350s, were not allocated to a specific operator, but were instead used jointly by Silverlink and Central Trains, both owned by National Express.

Pending the arrival of these trains, from September 2004 Silverlink introduced two sets of Mark 3 carriages, formerly of Virgin Trains, hauled by Virgin Class 87 and EWS Class 90 electric locomotives on peak-hour Northampton services.[14][15] Additionally, five Class 321s were hired from One, another National Express-owned operator.

Fleet

More information Class, Image ...
Thumb
Class 313 at North Woolwich in 2001, closed in 2006.
Remove ads

Depots

Silverlink's fleet was maintained at Bletchley Depot. Following Virgin Trains ceasing to operate electric locomotives, Silverlink's Metro fleet moved to Willesden Depot.

In 2006 Alstom proposed closing Willesden. The depot's closure would have meant the Class 508s would have had to relocate to another depot, and the Class 313s having to return to Bletchley Depot (which was also due to close). On 12 May 2007, Silverlink took over direct running of the depot and its staff for the final six months of its franchise.

Remove ads

Demise

As part of a wider redrawing of the rail franchise map by the Department for Transport, the Silverlink network was to be broken up when it was renewed in November 2007.

The Silverlink Metro services were moved to the control of Transport for London under the banner of the London Overground. On 19 June 2007 Transport for London announced it had awarded the London Overground concession to a Laing Rail/MTR joint venture.[16]

The Silverlink County services were merged with the Central Trains services around Birmingham to create a new West Midlands franchise. On 22 June 2007 the Department for Transport announced it had awarded the West Midlands franchise to Govia.[17]

Silverlink's services transferred to London Overground Rail Operations and London Midland on 11 November 2007.

Remove ads

References

Loading content...
Loading content...
Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads