Tokyo Metro Tozai Line

Subway line in Japan From Wikipedia, the free encyclopedia

Tokyo Metro Tozai Line
Remove ads

The Tokyo Metro Tozai Line (東京メトロ東西線, Tōkyō Metoro Tōzai-sen) is a rapid transit line in Tokyo and Chiba Prefecture, Japan, owned and operated by Tokyo Metro. Its name translates to "East-West Line". The line runs between Nakano in Nakano-ku, Tokyo and Nishi-Funabashi in Funabashi, Chiba Prefecture. The Tōzai Line was referred to as Line 5 during the planning stages; the seldom-used official name is Line 5 Tōzai Line (5号線東西線, Go-gō-sen Tōzai-sen). The line carries an average of 1,642,378 passengers daily (2017), making it the busiest line on the Tokyo Metro network.[1] On maps, diagrams and signboards, the Tōzai Line is shown using the color "sky blue" and its stations are given numbers using the letter "T".

Quick Facts Overview, Other name(s) ...


Tokyo Metro Tōzai Line train pulling into Waseda Station in 2015
Remove ads

Overview

Summarize
Perspective

The line runs through central Tokyo from east to west via Takadanobaba, Waseda, Ōtemachi, Nihombashi, Kiba and Urayasu. It was opened as a bypass route for the Chuo Rapid Line and the Sobu Line, which were heavily congested at the time. It is the only Tokyo Metro line to extend into Chiba Prefecture (although the Shinjuku Line operated by Toei also extends into Chiba Prefecture.) It also runs above-ground for 14 km (8.7 mi) from Minami-Sunamachi to Nishi-Funabashi, nearly half of the line and longer than any other railway line in the Tokyo subway network.

The Tōzai Line features through services at both ends of the line. Trains run onto the JR East Chūō-Sōbu Line for Mitaka at the western (Nakano) end, and onto either the Chūō-Sōbu Line for Tsudanuma or the Tōyō Rapid Railway Line for Tōyō-Katsutadai at the eastern (Nishi-Funabashi) end.

According to the Tokyo Metropolitan Bureau of Transportation in 2018, the Tokyo Metro Tōzai Line continues to be most crowded subway line in Tokyo, and the most crowded train line in all of Japan, with its peak running at 199% capacity[a] between Kiba and Monzen-Nakachō stations.[2][3] Women-only cars were introduced on the line for use during morning rush hour on November 20, 2006.

During the COVID-19 pandemic, peak ridership dropped from a rate of 199% in 2019 to 123% in 2020.

Remove ads

History

Summarize
Perspective

The Tōzai Line was planned by a review committee of the then Ministry of Transportation in 1962 and numbered Line 5. Its name literally means "East-West Line", and it was primarily planned to relieve traffic on the busy Sōbu Main Line as well as provide a straight crosstown connection through north-central Tokyo. Although this corridor is also served by the Tokyo Metropolitan Bureau of Transportation (Toei) Shinjuku Line and JR Keiyō Line, the Tōzai Line continues to operate beyond capacity due to its accessibility to other lines, as well as to growing condominium developments in eastern Tokyo.

The Takadanobaba to Kudanshita section opened in 1964,[4] and the remainder opened in stages until its completion in 1969. Through service with the then Japanese National Railways (today part of the JR Group) – a first for a Tokyo subway line – began in 1969 connecting the Chūō and Sōbu lines. This is a rare situation in Tokyo, as the only other subway line with through services onto JR lines is the Chiyoda Line.

The Tōyō Rapid Railway Line, effectively an eastward extension of the line, opened in 1996. It nevertheless remains a private entity to which the Tōzai lines offers through services.

Chronology

  • March 16, 1966: The line is extended at both ends. It now runs between Nakano and Takebashi.
  • April 28, 1966: Through service to the Chūō Line of JNR commences as far as Ogikubo.
  • October 1, 1966: Takebashi to Ōtemachi section opens.
  • September 14, 1967: Ōtemachi to Tōyōchō section opens.
  • March 29, 1969: Tōyōchō to Nishi-Funabashi section opens and Rapid service begins (non-stop between Tōyōchō and Nishi-Funabashi).
  • April 8, 1969: Through service on the Chūō Line is extended to Mitaka, and through service begins on the Sōbu line to Tsudanuma.
  • April 8, 1972: Through service on the Sōbu Line is withdrawn except during rush hours.
  • 1975: Another type of Rapid service is introduced, calling at Urayasu between Tōyōchō and Nishi-Funabashi.
  • October 1, 1979: Nishi-Kasai station opens.
  • March 27, 1981: Minami-Gyōtoku station opens.
  • 1986: Commuter Rapid service is introduced, running non-stop between Urayasu and Nishi-Funabashi.
  • (April 1, 1987: JNR is privatised. The Chūō and Sōbu lines become the property of JR East.)
  • 1996: The Rapid service that runs non-stop between Tōyōchō and Nishi-Funabashi ceases.
  • April 27, 1996: Tōyō Rapid Line opens between Nishi-Funabashi and Tōyō-Katsutadai. Through service begins.
  • January 22, 2000: Myōden station opens.
  • April 1, 2004: Teito Rapid Transit Authority (TRTA or Eidan) becomes Tokyo Metro.[5]
  • November 20, 2006: Women-only cars are introduced during morning rush hours.
Remove ads

Services

The Tōzai Line was the first Tokyo Metro line on which express services run: two types of rapid trains skip some stations east of Toyocho. The Tokyo Metro Fukutoshin Line began services on June 14, 2008, and also features express services.

Through services to Mitaka via the JR East Chūō Line and Tōyō-Katsutadai via the Tōyō Rapid Railway run all day. Outside of rush hours, only local trains run through to the Chūō Line and only rapid trains run through to the Tōyō Rapid Railway. During the morning and evening peak periods, through services run to Tsudanuma via the JR East Sōbu Line.

Station list

Summarize
Perspective
  • Local trains stop at every station. Rapid trains stop at stations marked "●" and do not stop at those marked "|". Some weekday westbound trains do not stop at stations marked "↑".
More information No., Station ...
  1. Nakano is shared by Tokyo Metro and JR East; JR East manages the station.
  2. Both the Tokyo Metro and Toei stations are displayed on station maps as being distant from one another, and they are not announced as transfer points for one another.
  3. Nishi-Funabashi is shared by Tokyo Metro, Tōyō Rapid Railway, and JR East; JR East and Tokyo Metro manage the station.
Remove ads

Rolling stock

Present

Tōzai Line trains are 10-car formations of 20-meter (65 ft 7 in)-long cars, with four doors per side and longitudinal seating. The maximum operating speed is 100 km/h (62 mph). Newer trains feature wide doors to allow for faster boarding times.

Past

Remove ads

Depots

Thumb
05N series EMU at Fukagawa Workshop
Thumb
Fukagawa Depot, April 2021
  • Fukagawa Depot (深川検車区)
  • Gyōtoku Depot (深川検車区行徳分室)
  • Fukagawa Workshop (深川工場)

Notes

a. ^ Crowding levels defined by the Ministry of Land, Infrastructure, Transport and Tourism:[7][8]

100% — Commuters have enough personal space and are able to take a seat or stand while holding onto the straps or hand rails.
150% — Commuters have enough personal space to read a newspaper.
180% — Commuters must fold newspapers to read.
200% — Commuters are pressed against each other in each compartment but can still read small magazines.