Top Qs
Timeline
Chat
Perspective

Trams in Warsaw

Tram system in Warsaw, Poland From Wikipedia, the free encyclopedia

Trams in Warsaw
Remove ads

The Warsaw tram network is a 146.2-kilometer (90.8 mi)[1][note 1] tram system serving a third of Warsaw, Poland, and serving half the city's population.[3] It operates 726 cars,[4] and is the second-largest system in the country (after the Silesian system).[5] There are about 25 regular lines,[6] forming a part of the city's integrated public transport system organized by the Warsaw Transport Authority. Since 1994, the system is operated by the municipally-owned company Tramwaje Warszawskie sp. z.o.o.

Quick Facts Overview, Native name ...
Remove ads
Thumb
Map of Warsaw tramway network before 1945
Thumb
Horse tram on Marszałkowska Street, 1867
Thumb
Electric tramway construction, Warsaw, Marszałkowska Street and Jerusalem Avenue intersection, 1907[2]
Thumb
Electric trams on Marszałkowska Street, 1914
Thumb
Restored type A, K and N trams running during a Night of Museums in 2021
Thumb
Restored Konstal N tram car from the 1950s running on a special tourist line
Thumb
Konstal 13N tram cars from the 1960s, retired in 2012
Remove ads

History

Summarize
Perspective

Horse tram

The history of tram transport in Warsaw dates back to 1866 when a 6-kilometre (3.7 mi) long horse tram line was built to transport goods and passengers between the Vienna Railway Station and the Petersburg and Terespol railway stations across the Vistula River. This was in order to circumvent limitations imposed by Russian authorities, which prevented the construction of a railway bridge for strategic reasons. In 1880, a second line was constructed with the help of Belgian capital, this time intended as public transit within the city. The Belgian company quickly expanded its own lines, and in 1882 took over the line between the railway stations, which had lost most of its original purpose after a railway bridge was finally built in 1875. In 1899 the entire tram system, by then 30 kilometres (19 mi) of tracks with 234 tram cars and 654 horses operating 17 lines, was purchased by the city. By 1903, plans were drafted to convert the system to electric trams, which was done by 1908.

Interbellum

The development mostly stagnated for the next 10 years with only a few short stretches built. After World War I, the network developed rapidly handling increased traffic and extending to the outskirts of the city with the network reaching the length of 60 kilometres (37 mi) and 757 tram cars in 1939. In 1927, a privately owned light rail line called EKD (today Warszawska Kolej Dojazdowa) was built, connecting several neighboring towns with the center of Warsaw using electric motor coaches similar to trams, only faster, larger and more massive, with frequent stops and tracks running along the streets in city; however the system was incompatible with the Warsaw trams as it used standard gauge tracks while the city network still used Russian gauge left from Russian times. In 1925, the company operating the Warsaw trams decided to construct an underground system. Preliminary boring started, but the work was suspended because of the Great Depression; the idea resurfaced in 1938, but was again buried with the outbreak of World War II.

Second half of the 20th century

The tram system remained operational, although gradually deteriorating, during most of the Nazi occupation until the Warsaw Uprising in 1944, after which all the infrastructure was systematically destroyed. After the war it was rebuilt relatively fast. As the system was practically built from scratch the occasion was used to convert it to standard gauge. During the 1950s and 1960s, the network was extended to newly built districts of soviet style panel houses and industrial plants and newer trams based on the design of Presidents' Conference Committee were introduced. Due to the city's lack of a metro system and restriction on car ownership, the tram system remained the backbone of Warsaw's transport system. In the 1960s, however, a political decision was made to increase the dependency on oil imported from Russia, while Polish coal was to be exported to Western Europe in exchange for hard currency; as a result, newly developed districts were connected with the city center by buses rather than trams, and some of the existing tracks were closed.

Present situation

After 1989, the tram system in Warsaw initially received little investment with a large part of the city's budget spent on the construction of the first Warsaw Metro line. However, since 2005, the situation has been changing with the purchase of new rolling stock, modernization of key tram lines, and deployment of a passenger information system. Plans also include extension of the network and an "intelligent" traffic management system which is to prioritize trams at traffic lights. In August 2008, a tender for delivery of 186 low-floor, air-conditioned trams was launched, allowing for a dramatic overhaul of the look of the tramway system.

In 2014 a first entirely new line since a quarter century was opened, connecting Tarchomin, a quickly growing remote residential district on the north-eastern outskirts of the city, with the existing tram network and the M1 metro line. The route underwent further expansion with the latest 1 km (0.6 mi) long segment finished in September 2021 after multiple delays.[7] More new lines are being planned: one with 4 km (2.5 mi) of new tracks to Gocław, and another to the eastern parts of the Białołęka district.[8] The construction of a new tram route to Wilanów was launched in August 2022[9] and was completed in October 2024.[10] It is unclear when work will start on the line to Gocław.[11]

Remove ads

Rolling stock

Summarize
Perspective
More information Image, Tram car type ...
Thumb
Konstal 105N2k/2000

Tram depots

More information Depot, Address ...

Historic fleet

Sources:[13][14]

More information Image, Model ...
Remove ads

Tickets

Thumb
Warszawska Karta Miejska, city travel card

There is a single fare system for every mode of transportation. Tickets can be purchased at ticket machines and newsagents all over the city, as well as using a mobile app.[15]

Thumb
Warsaw tram line 22 in 1940

Route list

Summarize
Perspective

This is a list of Warsaw Tramway lines. As of 2015, there were several track closures all over the tramway system, due to the construction of the second metro line. This list shows tram lines operating as of 26 October 2024 and the routes they operate on as of the same date.[6]

More information Daily, Weekdays ...
More information Route number, Description ...

The standard headway is every 8 minutes during peak hours and every 12 minutes off-peak, but the trams on lines 1, 9, 17, 31, and 33 run every 4–6 minutes. Line 2 has the most frequent service with trams running every 2 minutes during peak hours.

Remove ads

Tram loops/terminals

More information Name, Image ...
Remove ads

See also

Notes

  1. The figure given in the source is 292.4 km (181.7 mi) of single track in passenger service. It is assumed that the length of all routes (nearly all of them being double track) is about half that figure.

References

Loading content...
Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads