Yangang Station (Chinese: 燕岗站), formerly Jiangyan Lu Station (江燕路站),[1][2] is an interchange station between the Guangfo Metro (Guangfo line) and Line 11 of the Guangzhou Metro.[3] It is located under Gongye Avenue (工业大道) in the Haizhu District of Guangzhou.[4] The Guangfo line station opened on 28 December 2015.[5] It was the eastern terminus before the remaining section to Lijiao opened on 28 December 2018. The Line 11 station opened on 28 December 2024.[6]

Quick Facts Chinese name, Simplified Chinese ...
Remove ads

Station layout

Line 11

G - Exits F & H
L1
Concourse
Transfer passageway Transfer to  Guangfo 
 11  Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities
L2 - Station Equipment
L3
Platforms
Platform 4 arrow for L  11  Inner Circle (Diyuan)
Island platform, doors will open on the left
Platform 3  11  Outer Circle (Jiangtai Road) arrow for R

Guangfo line

G - Exits B & D
L1
Concourse
 Guangfo  Lobby Ticket Machines, Customer Service, Shops, Police Station, Security Screening Facilities, Transfer to  11 
L2
Platforms
Platform 2 arrow for L  Guangfo  towards Xincheng Dong (Shayuan)
Island platform, doors will open on the left
Platform 1  Guangfo  towards Lijiao (Shixi) arrow for R
Remove ads

Exits

More information Exit letter, Gallery ...
Remove ads

History

Summarize
Perspective

In the 2003 subway planning plan, the Central and South sections of the Industrial Avenue were identified as the lines of the Guangzhou section of the Guangzhou-Foshan Metro (Guangfo Metro), and the station appeared as one of the intermediate stations, in which the location was roughly the same as the current one. Subsequently, in the planning of Line 11, there was also a station named Yangang. Although the stations of the two lines was named Yangang at the time, they could only interchange at Shachong Station. The No. 11 environmental review, published in January 2014, showed that the two lines were designed to be far apart from each other at the station in Yanzigang and could not provide an interchange. However, in July 2014, the Guangzhou Municipal Planning Bureau replied to public inquiries that the two lines would be equipped with interchanges at the station,[7] and the Guangzhou Municipal Urban and Rural Construction Commission issued the "Notice on the Construction of Guangzhou Rail Transit Line 11" on September 4, which also added one interchange station compared with the environmental review.[8] Since then, the station has also been adjusted to Quantang Road with the line position, close to the Guangfo line station. At this point, it was officially confirmed that Yangang Station would become one of the interchange stations between Guangfo line and Line 11.

The main station structure of the Guangfo line station was topped out in December 2013. The station started the operation and commissioning stage on 1 July 2015, and opened on December 28 of the same year.[9] Affected by the obstruction of the construction of Lijiao Station, this station was the temporary eastern terminus of Guangfo line for three years.[10] It was not until 28 December 2018 that the remaining section of the rear section of Guangfo line (Yangang to Lijiao) was opened, and this station became a halfway station.[11]

The Line 11 station was topped out on 13 August 2020.[12] The "three rights" transfer was completed on 30 July 2024,[13] and on 28 December, the station was put into use with the opening of Line 11.[14]