Top Qs
Timeline
Chat
Perspective
Zengcheng Square station
Guangzhou Metro station From Wikipedia, the free encyclopedia
Remove ads
Zengcheng Square station (Chinese: 增城广场站), is a station of Line 21 of the Guangzhou Metro, and the eastern terminus of Line 21. It is also the easternmost station of the Guangzhou Metro system. It started operations on 28 December 2018.[1]
This article needs additional citations for verification. (January 2021) |
Remove ads
Station layout
L1 Concourse |
Lobby | Customer service, shops, vending machines, ATMs |
L2 Platforms |
Platform 2 | ![]() |
Island platform, doors will open on the left | ||
Platform 1 | 21 termination platform ![]() | |
L3 Platforms |
Platform | 16 reserved track area |
Reserved island platform | ||
Platform | 16 reserved track area |
Exits
There are 6 exits, lettered A, B, C, D, E and F. Exit E is accessible. Exits A and B are located on Lixin Highway, exits C and F are located on Zengcheng Avenue and exit E is located on Lijin Avenue.
Gallery
- Concourse
- Exit C
- Exit F
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads