Railway line in Gyeonggi-do and Seoul, South Korea From Wikipedia, the free encyclopedia

Seohae Line
Remove ads

The Seohae Line (Korean: 서해선; lit. West Sea Line) is a dual-track, electrified rail line in western Gyeonggi-do and Seoul, South Korea. The Seohae Line is being built in four sections simultaneously. The line runs 47 km (29 mi) south from Ilsan in Goyang City, crosses the Han River, passes Gimpo Airport, Sosa, Siheung, and ends in Wonsi in Ansan. There is a transfer to different lines at Daegok, Neunggok, Gimpo Int'l Airport, Bucheon Stadium, Sosa and Choji.[1] There are currently 21 stations (Ilsan-Wonsi). The line is operated by Korail, but the stations between Sosa and Wonsi are managed by SEO HAE RAIL CO., LTD., a subsidiary of Seoul Metro.[2] Since the infrastructure is also owned by Korail, the line runs on the left like the rest of the South Korean mainline railway network.

Quick Facts Overview, Native name ...
Remove ads
Quick Facts Hangul, Hanja ...
Remove ads

History

Summarize
Perspective

After the completion of planning, the project was written out as a build–lease–transfer (BLT) project, and Daewoo was selected[3] as preferred bidder in September 2008.[1] Construction was scheduled to last from October 2009 to March 2013.[4] Due to the 2008 financial crisis, it was difficult to gather investors to finance the project, and negotiations stalled.[1] An agreement was finally signed on 21 December 2010, with construction set to start in the first half of 2011.[1] Project costs are 1.5248 trillion; the contractor has altogether seven years for design and construction, and will manage and maintain the line for the first 20 years of operation.[1]

The first section began construction in 2011 and opened on 16 June 2018.[5] The second section runs north from Sosa to Daegok on the Gyeongui-Jungang Line and Seoul Subway Line 3, with transfers to several other lines. It was expected to open on 29 June 2021,[6] but did not open until 1 July 2023.[7][8] Another extension (Daegok-Ilsan) was opened at the end of August 2023.[9][10] As of October 2024, about ₩4.12 trillion (US$2.98 billion) has been spent on the Seohae Line.[11]

Future

Another extension (Ilsan-Unjeong) was approved in January 2024.[12] There is currently no opening date noted.

On 1 September 2010, the South Korean government announced a strategic plan to reduce travel times from Seoul to 95% of the country to under 2 hours by 2020. As part of the plan, the first section is to be further upgraded for 230 km/h (140 mph) the Wonsi–Hwayang extension is to be projected for 250 km/h (160 mph), and the line may see KTX service.[13]

Tentative plans foresee the upgrade and incorporation of the Gyooe Line, a single-track non-electrified line without passenger service that connects Neunggok station (with a junction just before Daegok station) and Uijeongbu station in Uijeongbu. The Uijeongbu–Daegok–Sosa–Wonsi Line would then provide orbital metro service as a northern semicircle around Seoul, complementing the southern semicircle formed by the Suin–Bundang Line.

Another part of the tentative 2010 plans was a southern extension from Wonsi, connecting up with the Janghang Line before Hongseong station.[14][7] As of April 2023, the construction of this section was 92% completed and was expected to be opened in the second half of October 2024.[15] However, by late 2024, the opening date of the Wonsi–Seohwaseong extension had been delayed to the first half of 2026.[16][17]

Remove ads

Rolling stock

Map of the Seohae Line and other surrounding lines

Thumb

Stations

Summarize
Perspective

Urban section

The section from Sosa to Wonsi opened on 16 June 2018. The first phase (Sosa to Daegok) of the Sosa to Ilsan extension opened on 1 July 2023. The second phase (Daegok to Ilsan) of the Sosa to Ilsan extension opened on 26 August 2023. The line currently utilizes seven four-car Class 391000 trains manufactured by Hyundai Rotem and ten four-car Class 391000 trains manufactured by Dawonsys.

Station
number
Station name
English
Station name
Hangul
Station name
Hanja
Transfer Distance
in km
Total
distance
Location
S07 Ilsan 일산 Gyeongui–Jungang Line (Shared) --- 0.0 Gyeonggi-do Goyang-si
S08 Pungsan 풍산 1.9 1.9
S09 Baengma 백마 1.7 3.6
S10 Goksan 곡산 1.6 5.2
S11 Daegok 대곡 Gyeongui–Jungang Line 1.7 6.9
S12 Neunggok 능곡 Gyeongui–Jungang Line 1.8 8.5
S13 Gimpo Int'l Airport 김포공항 Gimpo Goldline 7.4 15.9 Seoul Gangseo-gu
S14 Wonjong 원종 4.3 20.2 Gyeonggi-do Bucheon-si
S15 Bucheon Stadium 부천종합운동장 2.1 22.3
S16 Sosa
(Seoul Theological Univ.)
소사
(서울신대)
2.7 25.0
S17 Sosaeul
(Bucheon Univ. Sosa Campus)
소새울
(부천대 소사캠퍼스)
--- 1.7 26.7
S18 Siheung Daeya 시흥대야 2.1 28.8 Siheung-si
S19 Sincheon 신천 1.4 30.2
S20 Sinhyeon 신현 3.3 33.5
S22 Siheung City Hall 시흥시청 3.6 37.1
S23 Siheung Neunggok 시흥능곡 1.3 38.4
S24 Dalmi 달미 2.4 40.8 Ansan-si
S25 Seonbu
(Hando Hospital)
선부
(한도병원)
1.6 42.4
S26 Choji 초지 Suin–Bundang Line 1.7 44.1
S27 Siu 시우 1.4 45.5
S28 Wonsi 원시 1.5 47.0
S29 Int'l Theme Park (April 2027) 국제테마파크 國際− Hwaseong-si
S30 Seohwaseong (March 2026) 서화성 西華城

The line is being extended southward from Wonsi to Seohwaseongnamyang. Station names may be subject to change as the line is constructed and various sources give conflicting information.[18]

Remove ads

Conventional rail

Opened on 2 November 2024.

More information Station name, Transfer ...
Remove ads

See also

References